KFC Headquarters
Built the original building in 1970. Extensive renovation from 2000 to 2003. All renovation work was completed while all other areas remained in operation
Built the original building in 1970. Extensive renovation from 2000 to 2003. All renovation work was completed while all other areas remained in operation
Renovated existing sales pavilion consisting of installing new seats, enlarging press box, auctioneer’s stand and spotter’s booth. Added two new kitchens and renovated the main dining room. Created a food court, expanded and added a new bar. Added a repository for x-ray viewing. Added new conference area and administrative offices.
Renovation and addition to a historical building that has been converted into a private dining club. The existing dining area was expanded, a dining terrace was added and the kitchen completely replaced.
High end retail center, including seven individual tenant spaces and a free standing bank building.
Audubon Country Club renovation and expansion of new terrace, patio, entrance, dining room, ballroom, men’s and women’s locker rooms and the kitchen.
Demolition and reconstruction of existing grandstand consisting of 450,000 SF of new grandstand which included: food service, dining, dining facilities, Inter-track wagering space, private luxury suites, private club area, meeting rooms, new winner’s circle, two new entrance gates and porte-cochere. All work was completed with no interruption of Derby, Spring/Fall race meets and daily training of horses. We also renovated the Churchill Downs Jockey Club Suites
An 11,000 SF addition to the existing museum consisting of a new front entrance, new exhibit spaces and the remodeling of the kitchen and dining areas. Museum was closed for three months with grand re-opening date of 4/5/2000 confirmed prior to construction start of 7/1/1999
Recent Comments